electronica 2026 · Hall B5, Stand 578
AI and data center demand

AI is driving demand. We keep you supplied.

Memory, power, and passives are in high demand. Send your part numbers, and we check availability across 2,000+ manufacturers and suppliers.

Check availability

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Accepted file types: csv, xlsx, Max. file size: 10 MB.
Or upload a BOM (CSV or XLSX)
From the Q4 2026 Market Report

Where supply is tightest

Memory makers are putting new capacity into HBM, server DDR5, and enterprise SSDs. Legacy DDR4, eMMC, and commodity NAND see tighter supply as a result.

+10 to 15%Q4 2026 conventional DRAM contract price forecast
+15 to 20%Q4 2026 NAND flash contract price forecast
80%+Enterprise SSD bit demand growth forecast for 2026
Channel-reported

Legacy DDR3 book pricing is reportedly up about 50%, with DDR4 and LPDDR4 up about 10%.

Channel-reported

At least one networking account was reportedly told to expect no industrial DDR4 allocation, prompting pre-buys of 50,000 to 100,000+ units.

Parts we source in this category
DDR5DDR4DDR3 / DDR3L (EOL)eMMCEnterprise SSD and NAND
Check your part numbersPlanning a DDR3 or DDR4 last-time buy? The report has a step-by-step guide. Get the free report

AI racks are moving toward 800 VDC power distribution. That multiplies demand for PMICs, multiphase controllers, power MOSFETs, and SiC and GaN devices.

Up to 6 monthsLead times on part of a major analog portfolio, per a July 2026 notice
800 VDCWhere AI rack power distribution is heading, up from 12 V and 48 V
4Major analog makers with 2026 price notices
Channel-reported

Analog op-amp, DAC, and voltage-reference families are reported at 60 to 70 weeks.

Channel-reported

A MOSFET decommit tied to fab overbooking reportedly pushed new deliveries into late 2027.

Parts we source in this category
Power management ICsMultiphase controllersPower MOSFETs and power stagesSiC and GaN devicesAnalog and interface ICs
Check your part numbersThe report tracks 16 dated price rounds across power and analog. Get the free report

An AI server uses more than ten times as many MLCCs as a conventional server, and high-capacitance parts feel it first.

61 weeksFactory lead time listed for some high-capacitance MLCCs, October 2026
10xMLCCs in an AI server compared with a conventional server
+23%Price rise on a 47 µF MLCC, August to October 2026
Channel-reported

High-capacitance MLCCs are reportedly allocated by bidding.

Channel-reported

One major MLCC maker reportedly cut September allocations by about 20% ahead of its October 1 price rise.

Parts we source in this category
High-capacitance MLCCsPolymer tantalum capacitorsPolymer aluminum capacitorsPower inductors
Check your part numbersThe report's Allocation Watch shows where passives are tightest. Get the free report

Sources: TrendForce, manufacturer notices, and ASC Global market data, as published in the Q4 2026 Market Report. Data as of November 2, 2026. Channel-reported items come from distributor or customer reports and are not verified by the manufacturer.

From the Q4 report · Planning for the memory exit

DDR4 on your BOM? Plan the last-time buy now.

Memory makers are moving capacity to DDR5 and HBM, one major maker has ended DDR4 production, and DDR3 is already in tight supply. Before you commit, answer three questions:

  • How long must the equipment stay in production and service?
  • How much memory will manufacturing, repairs, and maintenance need?
  • Are technically qualified alternatives available?

Check DDR3 and DDR4 availabilityGet the full guide

Illustrative LTB calculation
Annual production1,200 systems
Support horizon× 5 years
Memory per system× 1 DDR4 module
Planning allowance× 1.15
Estimated LTB quantity6,900 modules

The 15% allowance is illustrative, not an industry benchmark. Adjust for existing stock, repair demand, scrap, MOQs, and possible redesigns.

Lab-tested and traceable

Every open-market part goes through our lab.

AS 6081AS 9120ISO 9001
91.8%of tested samples rated acceptable
8.2%rated not acceptable and rejected by our lab
2,000+manufacturers and suppliers in our network
9offices worldwide, shipping from the Americas, Europe, and Asia

Test results as published in the ASC Global Q4 2026 Market Report.

ASC Global custom M.2 NVMe SSD
Made by ASC

Custom SSDs. Built to your spec.

64GB to 30TB with a locked BOM and scheduled supply.

2.5" SATAM.2 SATAM.2 NVMeU.2 · U.3 · E1.S
See custom SSDs
Downloads

Learn more before the show

ASC GLOBAL ELECTRONICS 2026

Company presentation

Who we are, what we source, and what we make.

CUSTOM SSDs LINE CARD

Custom SSD line card

Form factors, capacities, and specifications.

BOARDING PASSFLORIDA EXPERIENCE
MUC
Munich
FLL
Fort Lauderdale

Book a qualified meeting. Win the Florida Experience.

All-expenses-paid trip for you and a guest to our Florida headquarters
A one-on-one meeting with our CEO
Sun, sand, and a tour of Fort Lauderdale
WhereHall B5 · 578
WhenNov 10 to 13
DrawBy Nov 30

Book a qualified meeting

Meetings at Hall B5, Stand 578, Messe München. No purchase necessary. Prize and entry details.

Free · electronica edition

Q4 2026 Market Report: Where Supply Is Tightest

  • Lead times and price trends for six component categories
  • 16 dated price rounds and where allocation is tightest
  • 20 end-of-life notices and a DDR4 last-time-buy guide

Get the free report

ASC Global Market Report Q4 2026 cover
Loading...